got the old engine out fitted new cluch to new engine and the old gear box off the old engine and onto the new! in less then a day and on my own without a engine lift!
started about half 12 and had to stop to go to my sisters 18th. by then i had the pipes/cables and drive shafts out. got back about 7 and had the engine out and the new one in by 12.
Nackard now but glad its over and done with!
cant wait to run the beast! :slayer:
started about half 12 and had to stop to go to my sisters 18th. by then i had the pipes/cables and drive shafts out. got back about 7 and had the engine out and the new one in by 12.
Nackard now but glad its over and done with!
cant wait to run the beast! :slayer:




Last edited: